| SUMMARY OF DOI RESPONSIBILITIES AND SCIENCE NEEDS RELATED TO WATER PROJECTS IN THE KISSIMMEE-OKEECHOBEE WATERSHED AND THE EVERGLADES AGRICULTURAL AREA
|
| Major DOI Responsibilities and Interests |
Major Unanswered Questions |
Needed Science |
Timeline |
|
Help ensure that hydrologic performance
targets accurately reflect the natural predrainage hydrology and ecology (DOI
CERP partnership responsibility)
|
Lake Okeechobee, Lake
Okeechobee Watershed and Kissimmee River Restoration
|
| What operating protocols for these projects
will mimic the natural predrainage hydrology in the Kissimmee-Okeechobee
Watershed?
|
Research and possible model refinement to
establish operating protocols
|
NEPA Scoping
Lake Okeechobee Watershed
Completed
Kissimmee River Restoration
|
| Aquifer Storage and Recovery |
| Will recovered ASR waters be of adequate
quality to discharge into natural areas?
|
Water quality studies
|
NEPA
Scoping
ASR
Pilot Projects
Completed
Pilot
Project Design Report (PPDR)
Complete
ASR
Projects
Currently
scheduled to start directly following completion of the pilots in November
2009
|
| EAA Reservoirs |
|
What hydrologic targets will mimic historic flows (including water depths, timing, and distribution) and water quality in the water conservation areas and Everglades National Park?
What operating protocols for releases of reservoir waters will mimic the natural predrainage hydrology in the Everglades?
What water quality hazards are associated with storing water on former agricultural lands, and how can they be avoided?
|
Research and modeling to refine hydrologic targets, including targets for water quality
Research and possible model refinement to establish operating protocols
Environmental risk assessments of water quality contaminants
|
NEPA
Scoping
Phase
1: 2001
Phase 2 TBD |
|
|
|
|
| Help ensure that hydrologic performance
targets protect threatened and endangered species and promote fish, wildlife,
and park values (consultations on project design related to DOI stewardship
responsibilities) |
Lake Okeechobee , Lake
Okeechobee Watershed and Kissimmee River
|
|
Where should treatment wetlands and reservoirs be sited to minimize negative impacts on flora and fauna in the basin and where possible to provide additional habitat benefits?
What are the potential benefits and adverse effects of the water treatment facilities and aboveground water storage reservoirs on watershed resources?
|
Studies of threatened/endangered species population distributions and abundance.
GIS mapping of habitat
Research to evaluate effects on dry prairie species
Research and modeling to evaluate effects on Everglade snail kites
|
EIS
Review, Section 7 Consultation, and CAR
Lake Okeechobee
Watershed
Draft CAR: Feb 2006
Draft PIR/EIS May 2006
Final CAR: Jan 2007
Final PIR/EIS:
April 2007
Kissimmee River
Restoration
Final CAR: 1992
|
| Aquifer Storage and Recovery
|
|
What factors contribute to fish mortality at intake structures? What intake configurations will best reduce the potential for impacting aquatic organisms?
What are the tolerances of plants and animals to the ranges of water quality likely to result from ASR?
|
Studies of the effects of intake pumps and control structures
Research to understand the tolerance of plants and animals to changes in water quality
|
EIS
Review, Section 7 Consultation, and CAR
ASR
Pilot Projects
Draft:
June 2004
Final:
November 2004
ASR
Projects
Currently
scheduled to start directly following completion of the pilots in November
2009
|
| EAA Reservoirs |
| Are there design and operational improvements that
could enhance the ecological value of the reservoirs without reducing the
intended purpose? |
Research to support design and operational rules to
enhance fish and wildlife resources
|
EIS Review,
Section 7 Consultation, and CAR
Phase 1
Draft:
October 2005
Final: December
2005
Phase 2:
TBD
|
|
|
|
|
| Major DOI Responsibilities and Interests |
Major Unanswered Questions |
Needed Science |
Timeline |
| Assess the responses of ecological communities
and species as a basis for adaptive management (continuation of DOI
responsibilities outlined above)
|
Lake Okeechobee, Lake
Okeechobee Watershed and Kissimmee River Restoration
|
| What are the project
effects on Audubon's crested caracara, Florida grasshopper sparrow, and
Everglade snail kite? (Lake
Okeechobee Regulation Schedule review is included with CERP and other C&SF Projects.)
|
Monitoring and assessment to determine species
responses to habitat changes:
- Audubon's crested caracara
- Florida grasshopper sparrow
- Everglade snail kite (and its prey, Florida apple snail)
|
Post-implementation
monitoring and assessment
For
proposed revision to Lake Okeechobee Regulation Schedule, monitoring of apple
snail abundance in the lake's littoral zone must start in FY 06 and continue
indefinitely.
|
| Aquifer Storage and Recovery
|
| What are the project effects on fish and
wildlife in target ASR locations?
What are the effects of water recovered from
ASR projects on fish and wildlife in downstream wetlands and estuaries?
Does the Upper Floridan contribute to
subsurface flows into Biscayne and Florida Bays?
How will the Implementation of ASR in CERP affect
the water quality, geohydrology and/or ecology in Biscayne or Florida Bay?
|
Baseline studies and monitoring at ASR
locations
Baseline studies and monitoring in downstream
wetlands
Geological description of the Floridan aquifer
under peninsular Florida, the continental margin, and Biscayne and Florida Bays.
Research and modeling to determine the effects
to the ecology of Biscayne or Florida Bay.
|
Post-implementation
monitoring and assessment
|
| EAA Reservoirs
|
| What are the effects of the reservoirs on fish
and wildlife values?
What are the effects of water recovered from
EAA reservoirs on fish and wildlife in downstream wetlands and estuaries?
|
Monitoring and assessment to determine the
effects of the reservoirs on the natural system
|
Post-implementation
monitoring and assessment
Part 1, Phase 1 Completion:
Dec 2009
Part 1, phase 2
Complete 2015
Part 2 Completion:
2020
|