USGS
South Florida Information Access
SOFIA home
Help
Projects
by Title
by Investigator
by Region
by Topic
by Program
Results
Publications
Meetings
South Florida Restoration Science Forum
Synthesis
Information
Personnel
About SOFIA
USGS Science Strategy
DOI Science Plan
Education
Upcoming Events
Data
Data Exchange
Metadata
publications > report > DOI science plan in support of ecosystem restoration, preservation, and protection in south florida > tables > table 1

SUMMARY OF DOI RESPONSIBILITIES AND SCIENCE NEEDS RELATED TO WATER PROJECTS IN THE KISSIMMEE-OKEECHOBEE WATERSHED AND THE EVERGLADES AGRICULTURAL AREA
Major DOI Responsibilities and Interests Major Unanswered Questions Needed Science Timeline

Help ensure that hydrologic performance targets accurately reflect the natural predrainage hydrology and ecology (DOI CERP partnership responsibility)

Lake Okeechobee, Lake Okeechobee Watershed and Kissimmee River Restoration
What operating protocols for these projects will mimic the natural predrainage hydrology in the Kissimmee-Okeechobee Watershed? Research and possible model refinement to establish operating protocols

NEPA Scoping
Lake Okeechobee Watershed
Completed
Kissimmee River Restoration

Aquifer Storage and Recovery
Will recovered ASR waters be of adequate quality to discharge into natural areas?

Water quality studies

NEPA Scoping
ASR Pilot Projects
Completed
Pilot Project Design Report (PPDR)
Complete
ASR Projects
Currently scheduled to start directly following completion of the pilots in November 2009
EAA Reservoirs

What hydrologic targets will mimic historic flows (including water depths, timing, and distribution) and water quality in the water conservation areas and Everglades National Park?

What operating protocols for releases of reservoir waters will mimic the natural predrainage hydrology in the Everglades?

What water quality hazards are associated with storing water on former agricultural lands, and how can they be avoided?

Research and modeling to refine hydrologic targets, including targets for water quality

Research and possible model refinement to establish operating protocols

Environmental risk assessments of water quality contaminants

NEPA Scoping
Phase 1: 2001
Phase 2 TBD
Help ensure that hydrologic performance targets protect threatened and endangered species and promote fish, wildlife, and park values (consultations on project design related to DOI stewardship responsibilities) Lake Okeechobee , Lake Okeechobee Watershed and Kissimmee River

Where should treatment wetlands and reservoirs be sited to minimize negative impacts on flora and fauna in the basin and where possible to provide additional habitat benefits?

What are the potential benefits and adverse effects of the water treatment facilities and aboveground water storage reservoirs on watershed resources?

Studies of threatened/endangered species population distributions and abundance.

GIS mapping of habitat

Research to evaluate effects on dry prairie species

Research and modeling to evaluate effects on Everglade snail kites

EIS Review, Section 7 Consultation, and CAR
Lake Okeechobee Watershed
Draft CAR: Feb 2006
Draft PIR/EIS May 2006
Final CAR: Jan 2007
Final PIR/EIS: April 2007
Kissimmee River Restoration
Final CAR: 1992
Aquifer Storage and Recovery

What factors contribute to fish mortality at intake structures? What intake configurations will best reduce the potential for impacting aquatic organisms?

What are the tolerances of plants and animals to the ranges of water quality likely to result from ASR?

Studies of the effects of intake pumps and control structures

Research to understand the tolerance of plants and animals to changes in water quality

EIS Review, Section 7 Consultation, and CAR
ASR Pilot Projects
Draft: June 2004
Final: November 2004
ASR Projects
Currently scheduled to start directly following completion of the pilots in November 2009
EAA Reservoirs
Are there design and operational improvements that could enhance the ecological value of the reservoirs without reducing the intended purpose? Research to support design and operational rules to enhance fish and wildlife resources

EIS Review, Section 7 Consultation, and CAR
Phase 1
Draft: October 2005
Final: December 2005
Phase 2: TBD

Major DOI Responsibilities and Interests Major Unanswered Questions Needed Science Timeline
Assess the responses of ecological communities and species as a basis for adaptive management (continuation of DOI responsibilities outlined above) Lake Okeechobee, Lake Okeechobee Watershed and Kissimmee River Restoration
What are the project effects on Audubon's crested caracara, Florida grasshopper sparrow, and Everglade snail kite? (Lake Okeechobee Regulation Schedule review is included with CERP and other C&SF Projects.) Monitoring and assessment to determine species responses to habitat changes:
  • Audubon's crested caracara
  • Florida grasshopper sparrow
  • Everglade snail kite (and its prey, Florida apple snail)

Post-implementation monitoring and assessment

For proposed revision to Lake Okeechobee Regulation Schedule, monitoring of apple snail abundance in the lake's littoral zone must start in FY 06 and continue indefinitely.

Aquifer Storage and Recovery
What are the project effects on fish and wildlife in target ASR locations?

What are the effects of water recovered from ASR projects on fish and wildlife in downstream wetlands and estuaries?

Does the Upper Floridan contribute to subsurface flows into Biscayne and Florida Bays?

How will the Implementation of ASR in CERP affect the water quality, geohydrology and/or ecology in Biscayne or Florida Bay?

Baseline studies and monitoring at ASR locations

Baseline studies and monitoring in downstream wetlands

Geological description of the Floridan aquifer under peninsular Florida, the continental margin, and Biscayne and Florida Bays.

Research and modeling to determine the effects to the ecology of Biscayne or Florida Bay.

Post-implementation monitoring and assessment

EAA Reservoirs
What are the effects of the reservoirs on fish and wildlife values?

What are the effects of water recovered from EAA reservoirs on fish and wildlife in downstream wetlands and estuaries?

Monitoring and assessment to determine the effects of the reservoirs on the natural system

Post-implementation monitoring and assessment
Part 1, Phase 1 Completion:
Dec 2009

Part 1, phase 2
Complete 2015

Part 2 Completion:
2020


< List of Tables


| Disclaimer | Privacy Statement | Accessibility |

U.S. Department of the Interior, U.S. Geological Survey
This page is: http://sofia.usgs.gov/publications/reports/doi-science-plan/tables/table1.html
Comments and suggestions? Contact: Heather Henkel - Webmaster
Last updated: 26 April, 2006 @ 01:05 PM(KP)